Foothill Drive Curve Realignment
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Reconfigure the curve on Foothill Drive approximately 1,116' from the City of Vacaville limits. Construct a 32-foot-wide roadway section of 2" of " Hot Mix Asphalt (HMA) over 3" of " HMA over 12" of aggregate base.
- Status
- Prospective
- Sector
- Government, Road, Manufacturing (Industrial), Commercial
- Location
- Fairfield, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Foothill Drive Curve Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconfigure the curve on Foothill Drive approximately 1,116' from the City of Vacaville limits. Construct a 32-foot-wide roadway section of 2" of " Hot Mix Asphalt (HMA) over 3" of " HMA over 12" of aggregate base. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fairfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
