logo

Foothills New Solar and Substation

Sector: Solar • Location: Loveland, Colorado, United States of America

Source: Dodge

Project
Pre-Design

Large-scale solar power installation to replace the damaged Idylwilde hydroelectric dam. The project includes a 3.5 megawatt solar array with tracking technology and an electric substation. It's expected to produce about 6,813 megawatt hours of electricity annually, powering approximately 574 homes.

Project Information FAQ

Project Information

4 Q
The project “Foothills New Solar and Substation” is an infrastructure initiative in the Solar sector, located in Loveland, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Large-scale solar power installation to replace the damaged Idylwilde hydroelectric dam. The project includes a 3.5 megawatt solar array with tracking technology and an electric substation. It's expected to produce about 6,813 megawatt hours of electricity annually, powering approximately 574 homes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data