Foothills New Solar and Substation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Large-scale solar power installation to replace the damaged Idylwilde hydroelectric dam. The project includes a 3.5 megawatt solar array with tracking technology and an electric substation. It's expected to produce about 6,813 megawatt hours of electricity annually, powering approximately 574 homes.
- Status
- Prospective
- Sector
- Solar, Hydro, Government, Power Generation (CCGT), Residential, Commercial, Water Supply and Storage
- Location
- Loveland, Colorado, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Foothills New Solar and Substation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Large-scale solar power installation to replace the damaged Idylwilde hydroelectric dam. The project includes a 3.5 megawatt solar array with tracking technology and an electric substation. It's expected to produce about 6,813 megawatt hours of electricity annually, powering approximately 574 homes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Loveland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Hydro, Government, Power Generation (CCGT), Residential, Commercial, Water Supply and Storage |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
