logo
ProjectCompleted

Foothills Recreational Trail Bridge Replacement

Completed · Washington · Last reported Mar 2026

Source: GlobeNewswire

Acrow supplied a modular steel bridge to restore full-route access of the Foothills National Recreation Trail southeast of Tacoma, Washington. The new permanent bridge replaced the old timber Spiketon Ditch Bridge which was closed due to severe structural deficiencies. The 160-foot long and 12-foot wide bridge was designed to AASHTO HS15 loading with an asphalt overlay deck and installed using the

Status
Closed
Sector
Forest Products and Packaging, Steel, Bridge, Road
Location
Pierce County, Washington, United States of America
Updated
22 Jul 2026
Source
GlobeNewswire

ConstructChat

Ask ConstructChat about Foothills Recreational Trail Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Foothills Recreational Trail Bridge Replacement” is an infrastructure initiative in the Forest Products and Packaging sector, located in Pierce County, Washington, United States. Taiyo aggregates data on it from GlobeNewswire.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Acrow supplied a modular steel bridge to restore full-route access of the Foothills National Recreation Trail southeast of Tacoma, Washington. The new permanent bridge replaced the old timber Spiketon Ditch Bridge which was closed due to severe structural deficiencies. The 160-foot long and 12-foot wide bridge was designed to AASHTO HS15 loading with an asphalt overlay deck and installed using the cantilever launch method.

Original sector

Construction & Materials

Location

Country

United States of America (USA)

State

Washington

City

Pierce County

Source

Source

GlobeNewswire

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Steel, Bridge, Road

Article published date

2026-03-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project