Footlocker Kids Foot Locker - Cross Creek Mall - Upfit
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge
12,725 SF - Remodel expansion of the existing footlocker store. Combing three existing tenant spaces into one space. Four new air handling units. Two new restrooms with two water closets, two lavs, one breakroom sink, one mop sink, one drinking fountain and a hot water heater,
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial)
- Location
- Fayetteville, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Footlocker Kids Foot Locker - Cross Creek Mall - Upfit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 12,725 SF - Remodel expansion of the existing footlocker store. Combing three existing tenant spaces into one space. Four new air handling units. Two new restrooms with two water closets, two lavs, one breakroom sink, one mop sink, one drinking fountain and a hot water heater, |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fayetteville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
