For Living Wall Revitalization at Progress Campus
Sector: Manufacturing (Industrial) • Location: Toronto, Ontario, Canada
Source: Dodge
The college is seeking a vendor who specializes in installing and maintaining living wall systems and extensive experience in this field, with a licensed engineer on staff as being beneficial, to undertake the revitalization of the Progress Campus 4-storey living wall (installed in 2012) located in the Ann Buller Learning Centre, which is now at its end of life and needs replacement with the same
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Toronto, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about For Living Wall Revitalization at Progress Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The college is seeking a vendor who specializes in installing and maintaining living wall systems and extensive experience in this field, with a licensed engineer on staff as being beneficial, to undertake the revitalization of the Progress Campus 4-storey living wall (installed in 2012) located in the Ann Buller Learning Centre, which is now at its end of life and needs replacement with the same or similar system. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
