logo
ProjectClosed

Force Main 3 Reconstruction Phase 1

Closed · New Mexico · Last reported Mar 2024

Source: Dodge USA

Construction of2,223 feet, more or less, of new 12-inch diameter sewer force main, including but not limited to materials and labor for installation of new pipe, fittings ,thrust blocking, traffic control, erosion control, permitting, removal of portions of existing sewer force main as shown on the plans, ditch crossing, protection of existing utilities and culverts, and coordination with utility

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT)
Location
Kirtland, New Mexico, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Force Main 3 Reconstruction Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Force Main 3 Reconstruction Phase 1” is an infrastructure initiative in the Commercial sector, located in Kirtland, New Mexico, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of2,223 feet, more or less, of new 12-inch diameter sewer force main, including but not limited to materials and labor for installation of new pipe, fittings ,thrust blocking, traffic control, erosion control, permitting, removal of portions of existing sewer force main as shown on the plans, ditch crossing, protection of existing utilities and culverts, and coordination with utility companies as required

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Mexico

City

Kirtland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Power Generation (CCGT)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project