Force Main Repairs and Air Valve Replacements REBID
Sector: Water Supply and Storage • Location: Waldwick, New Jersey, United States of America
Source: Dodge
Project generally consists of the removal and replacement of air release valves on the Darlington and Franklin Lakes sanitary sewer force mains and the investigation of defects, identified by inspections performed by Pure Technologies in 2022 and 2023, on the Ho-Ho-Kus and Darlington sanitary sewer force mains. The project will consist of excavating and exposing the defect locations on the force m
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Waldwick, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Force Main Repairs and Air Valve Replacements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project generally consists of the removal and replacement of air release valves on the Darlington and Franklin Lakes sanitary sewer force mains and the investigation of defects, identified by inspections performed by Pure Technologies in 2022 and 2023, on the Ho-Ho-Kus and Darlington sanitary sewer force mains. The project will consist of excavating and exposing the defect locations on the force mains, performing electromagnetic testing to determine the extent of pipe wall loss, and rehabilit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Waldwick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
