logo
ProjectClosed

Force Main Replacement

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

furnishing of all labor and material for the construction of the following items in the approximate quantities indicated: Quantity Item 1LS Mobilization 2005 Legal Notices 1LSClearing and Grubbing 1,500LFSilt Fence 3EA Tracking Pad 7,500 SY RestorationSeed, Mulch, and Matting 1 LS Traffic Control 7,200 LF Abandon 12 inch Force Main 6 EA Abandon Air Release Manhole 1 LS Temporary Bypass System 1 LS

Status
Closed
Sector
Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Metal
Location
Oconomowoc, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Force Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Force Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Oconomowoc, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

furnishing of all labor and material for the construction of the following items in the approximate quantities indicated: Quantity Item 1LS Mobilization 2005 Legal Notices 1LSClearing and Grubbing 1,500LFSilt Fence 3EA Tracking Pad 7,500 SY RestorationSeed, Mulch, and Matting 1 LS Traffic Control 7,200 LF Abandon 12 inch Force Main 6 EA Abandon Air Release Manhole 1 LS Temporary Bypass System 1 LS Dewatering 1 LS Utility Exploration 4 EA Connections to Existing Utility 10 LF Steel 24-Inch Cas...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Oconomowoc

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Metal

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project