Ford Class CVN Infrastructure Upgrades - Pier Lima
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
Estimated Project Value: 68.9M Project Scope: Constructs a new 69KV Substation X and upgrades existing facilities and infrastructure to increase total Pier Lima electrical capacity. Includes proposed Concrete Masonry Unit CMU building with split face exterior and smooth face interior, cast-in-place concrete floor and membrane roof over built-up protection board, rigid insulation and metal decking.
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Metal, Cement
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ford Class CVN Infrastructure Upgrades - Pier Lima
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Estimated Project Value: 68.9M Project Scope: Constructs a new 69KV Substation X and upgrades existing facilities and infrastructure to increase total Pier Lima electrical capacity. Includes proposed Concrete Masonry Unit CMU building with split face exterior and smooth face interior, cast-in-place concrete floor and membrane roof over built-up protection board, rigid insulation and metal decking. Includes 13.8KV power mounds at two locations on Pier Lima. Facility-related control systems inc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Metal, Cement |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
