logo

Forest Avenue Development Phase - Ii

Sector: Commercial • Location: Minto, New Brunswick, Canada

Source: Dodge USA

Project
Bidding

The Work consists generally of construction of: - The construction of a subdivision; - Approximately 860m of roadway with ditched drainage. All roads will be finished with asphalt pavement; - Approximately 750m of 200mm PVC gravity sanitary sewer main including forty (40) 100mm residential sewer services and twelve (12) sanitary manholes; - Approximately forty (40) 100mm PVC drain tile piping from

Status
Prospective
Sector
Commercial, Water Supply and Storage, Waste Processing and Treatment, Residential, Road, Government, Raw Materials
Location
Minto, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Forest Avenue Development Phase - Ii

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Forest Avenue Development Phase - Ii” is an infrastructure initiative in the Commercial sector, located in Minto, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work consists generally of construction of: - The construction of a subdivision; - Approximately 860m of roadway with ditched drainage. All roads will be finished with asphalt pavement; - Approximately 750m of 200mm PVC gravity sanitary sewer main including forty (40) 100mm residential sewer services and twelve (12) sanitary manholes; - Approximately forty (40) 100mm PVC drain tile piping from ditch; - Earthworks and grading for approximately forty (40) individual and greenspace areas; - ...

Procurement method

Budget

Location

Country

Canada

State

New Brunswick

City

Minto

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Waste Processing and Treatment, Residential, Road, Government, Raw Materials

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project