logo

Forest City Enterprises’ Pharmaceutical Facility in Skokie, Illinois, US

Sector: Advanced Electronics • Location: United States

Source: Pharmaceutical Technology

Project
Closed

Now owned by Pfizer, Pharmacia Corporation announced in 2000 the opening of its new facility in Skokie in Illinois, US. 2005 Refurbished biotech campus Skokie, Illinois, USA $43m (but investment could reach $155m over the period from 2005 to 2010) 2010 Forest City Development, iBIO, Forest City (Bioscience & Technology Group) J.L.Burke Contracting Inc. (Refurbished the parking garage in 2000) Fore

Project Information FAQ

Project Information

4 Q
The project “Forest City Enterprises’ Pharmaceutical Facility in Skokie, Illinois, US” is an infrastructure initiative in the Advanced Electronics sector, located in United States. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Now owned by Pfizer, Pharmacia Corporation announced in 2000 the opening of its new facility in Skokie in Illinois, US. 2005 Refurbished biotech campus Skokie, Illinois, USA $43m (but investment could reach $155m over the period from 2005 to 2010) 2010 Forest City Development, iBIO, Forest City (Bioscience & Technology Group) J.L.Burke Contracting Inc. (Refurbished the parking garage in 2000) Forest City Development, State of Illinois, Village of Skokie Biotech research and small scale manufacturing Now owned by Pfizer, Pharmacia Corporation announced in 2000 the opening of its new facility in Skokie in Illinois, US. Pharmacia Corporation was formed by an agreement between Monsanto/Searle and Pharmacia & St. John. Pfizer and Pharmacia Corporation began operating as a unified company in April 2003. Several significant new medicines were discovered and developed at the Skokie site, including the blockbuster drug Celebrex.For decades, the facility conducted significant pharmaceutical research on everything from birth control to Nutra Sweet. In late 2003, Pfizer announced the closure of the Skokie facility in a worldwide reorganisation. The closure affected 1,500 research and administrative jobs in the Chicago area. In early 2005,developer Forest City Enterprises purchased the former Pfizer Pharmaceuticals property for $43m, including 1 million ft² of research and office space across nine buildings. The negotiations took 12 months but Pfizer had promised the local community that they would sell the property to a developer who would bring employment to the area. Forest City planned to invest more than $155m in the park over a ten year period, while Illinois committed $5m to the project, and the Village of Skokie provided $10m from the proceeds of two General Obligation Bond issues supported by a new Tax Increment Financing (TIF) district. The funds were provided to Forest City as reimbursement for TIF eligible expenses. The assessed valuation of the Forest City property significantly declined from a peak of $35,256,000 valuation. Property improvements are projected to significantly increase the assessed valuation and generate the TIF revenue necessary to pay off the bond issues. The complex was called the Illinois Technology Innovation Campus. The facility contains a range of companies and is expected to create more than 3,250 jobs (Skokie’s employment base is around 35,000 and so this represents an increase of around 9.5%). Forest City officials estimate that the campus will generate $1.8bn annually in State-wide economic activity, according to a study conducted by Applied Real Estate Analysis. A couple of the buildings on the site needed renovation. The campus was predicted to have upwards of 14 companies conducting important research combined with the ability to communicate with each other. The refurbished campus was put forward as a perfect site for the location of bioscience and biopharmaceutical start-up companies. The project was overseen by Forest City’s Boston-based University, Bioscience & Technology Group, which developed the old corporate facility into a state-of-the-art research campus over a period of five to ten years. Construction began in Q3 2005. President of the Illinois Biotechnology Industry Organisation (iBIO) David Miller said: “The importance of the new Illinois Science and Technology Park cannot be overstated. “It provides a focal point for the creation of a world recognised biosciences node, one which will draw to our community the best scientific and business talent, not to mention outside capital eager to back Illinois companies.” From 1998, the Skokie site underwent a series of improvements to enhance production capacity and research and development (R&D) capabilities. The last building constructed was the Q Building. The new facility was designed and built under the US Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating system to create a green lab facility with a gold LEED rating that conserved energy and used recycled and locally available materials. The Q Building was designed to be 40% more efficient than similar lab buildings, reducing energy requirements and emissions. The steel beams in the construction were made from 100% recycled steel and the wallboard was made from the purified waste products of power plants. The carpeting and ceiling tiles contained a large percentage of recycled material. The Q Building was designed to maximise the collaboration among scientists of different disciplines. Primarily planned as a chemistry building, its flexible design was able to accommodate other scientific endeavours. The building has a floor space of 170,000ft² and required an investment of $78m to construct. To address the issue of energy conservation at the Q Building, the building’s designers incorporated a combination of infrared sensors and high-efficiency air-handling units to ensure that the minimal amounts of energy were being expended to operate the building motion sensors allowing for the mechanical monitoring of the presence of occupants. When there were no lab occupants for a specified period of time, a variety of adjustments were made within the building. For example, lights were automatically turned off; the velocity of air being removed through exhaust hoods was reduced. In addition, air-handling units were analysed based on operating costs over an extended period rather than based on initial cost alone. The campus has a whole range of advantages, including adequate parking. In 2000, JL Burke Contracting completed a refurbishment of the parking complex near the front entrance of the campus. They started the work in 1999 for Searle and completed it under the ownership of Pfizer. A two-level structure now parks 900 vehicles near the main entrance. The expansion presented the company with a complex engineering situation. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data