Forest Service ERFO Paving REBID
Sector: Raw Materials • Location: Oroville, California, United States of America
Source: Dodge
The USDA Forest Service Procurement and Property Services, Field Procurement Operations, Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to apply a 2-inch compacted layer of TYPE II hot-mix asphalt concrete on the designated travel way. This work encompasses the preparation of the existing aggregate base subgrade for paving and the supply a
- Status
- Closed
- Sector
- Raw Materials, Road, Commercial, Cement
- Location
- Oroville, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Forest Service ERFO Paving REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The USDA Forest Service Procurement and Property Services, Field Procurement Operations, Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to apply a 2-inch compacted layer of TYPE II hot-mix asphalt concrete on the designated travel way. This work encompasses the preparation of the existing aggregate base subgrade for paving and the supply and application of the 2-inch compacted asphalt concrete across varying widths of the travel way, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oroville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Commercial, Cement |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
