Forestry Trunk Road Stabilization
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
The scope of work for this project shall include but is not limited to the following: Widen Road to Required Subgrade Width Subgrade Excavation Drainage Improvements Subgrade Preparation Minimum 200mm depth Granular Base Course Des 4 Class 25 (150 - 350mm depth) Other work as indicated in the unit price schedule and special provisions
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials
- Location
- Greenview, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Forestry Trunk Road Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this project shall include but is not limited to the following: Widen Road to Required Subgrade Width Subgrade Excavation Drainage Improvements Subgrade Preparation Minimum 200mm depth Granular Base Course Des 4 Class 25 (150 - 350mm depth) Other work as indicated in the unit price schedule and special provisions |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Greenview |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
