Former OPG - River Trail Relocation
Design development · Ontario · Last reported May 2023
Source: Dodge USA
The works are located on the west side of St. Clair Parkway, south of Oil Springs Line, and adjacent to the former OPG site, in the Township of St. Clair. Generally, the work includes: a) Removal of the existing asphalt river trail b) Excavation of existing shoulder to accommodate new trail c) Placement of new granular base and HL-3 asphalt shoulder d) All restoration to complete the works
- Status
- Prospective
- Sector
- Oil and Gas, Road, Mass Transit, Government, Rail, Commercial
- Location
- St Clair Township, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Former OPG - River Trail Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The works are located on the west side of St. Clair Parkway, south of Oil Springs Line, and adjacent to the former OPG site, in the Township of St. Clair. Generally, the work includes: a) Removal of the existing asphalt river trail b) Excavation of existing shoulder to accommodate new trail c) Placement of new granular base and HL-3 asphalt shoulder d) All restoration to complete the works |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | St Clair Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Road, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
