Forsythia on the Park Condominium Complex
Sector: Commercial • Location: Clayton, Missouri, United States of America
Source: Dodge USA
proposed, the complex will have 23 condos with two bedrooms and 2.5 baths, and 19 condos with three bedrooms and 3.5 baths, with balconies for every unit. The first floor will have a lobby and some amenity or retail component that would take up 4,400 sf. The complex would have an 86-space parking garage in the basement of the building.
- Status
- Under Construction
- Sector
- Commercial, Consumer Products, Residential, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Clayton, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Forsythia on the Park Condominium Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | proposed, the complex will have 23 condos with two bedrooms and 2.5 baths, and 19 condos with three bedrooms and 3.5 baths, with balconies for every unit. The first floor will have a lobby and some amenity or retail component that would take up 4,400 sf. The complex would have an 86-space parking garage in the basement of the building. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Clayton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Residential, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
