Fort Bend Co Wastewater Treatment Plant Rehabilitation
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
Construction of Wastewater Treatment Plant Rehabilitation including but not limited to, replacement in kind of the three (3) existing multi-stage, centrifugal blowers including motors, protective coatings, local control panels, piping, valves, instruments, and fittings up to the connection to the existing air header outside of the building; construction of a new separating wall in the existing blo
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Government
- Location
- Sugar Land, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fort Bend Co Wastewater Treatment Plant Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of Wastewater Treatment Plant Rehabilitation including but not limited to, replacement in kind of the three (3) existing multi-stage, centrifugal blowers including motors, protective coatings, local control panels, piping, valves, instruments, and fittings up to the connection to the existing air header outside of the building; construction of a new separating wall in the existing blower building; replacement of the existing non-potable water control panel. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sugar Land |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
