logo

Fort Bliss Multi-Tiered Data Center

Sector: Power Generation (CCGT) • Location: El Paso, Texas, United States

Source: AOL

Project
Planned

The U.S. Army and Carlyle Group are negotiating to build a massive, multi-tiered data center on unused Army-owned land at Fort Bliss in Far East El Paso. The facility will be self-contained, generating its own electricity and using a net-neutral closed-loop water system to avoid straining local resources. It will provide dedicated computing power to the Army and operate as a hyperscale commercial

Status
Prospective
Sector
Power Generation (CCGT), Data Center, Water Supply and Storage, Commercial
Location
El Paso, Texas, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Fort Bliss Multi-Tiered Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Fort Bliss Multi-Tiered Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in El Paso, Texas, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The U.S. Army and Carlyle Group are negotiating to build a massive, multi-tiered data center on unused Army-owned land at Fort Bliss in Far East El Paso. The facility will be self-contained, generating its own electricity and using a net-neutral closed-loop water system to avoid straining local resources. It will provide dedicated computing power to the Army and operate as a hyperscale commercial data center for private clients. The project is in preliminary phases with ongoing negotiations and regulatory checks.

Original sector

Technology

Location

Country

United States of America (USA)

State

Texas

City

El Paso

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center, Water Supply and Storage, Commercial

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project