logo

Fort Clarke Blvd Sanitary Sewer Gravity Main Improvements

Sector: Water Supply and Storage • Location: Florida, United States of America

Source: Dodge USA

Project
Bidding

This project will provide GRU with the additional flow capacity required to accommodate upcoming development projects and will also address the issues associated with pipe degradation along this alignment. The replacement gravity sewer main will be 24 in diameter and will be replaced with a PVC pipe. The overall project length is roughly 2,500 feet of new gravity sewer main and will include two tr

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
Location
Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fort Clarke Blvd Sanitary Sewer Gravity Main Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fort Clarke Blvd Sanitary Sewer Gravity Main Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will provide GRU with the additional flow capacity required to accommodate upcoming development projects and will also address the issues associated with pipe degradation along this alignment. The replacement gravity sewer main will be 24 in diameter and will be replaced with a PVC pipe. The overall project length is roughly 2,500 feet of new gravity sewer main and will include two trenchless jack and bore pipe crossings under existing Alachua county roadways. The existing 16 duc...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project