logo
ProjectPlanned

Fort Covington Solar Project

The owner, status and timeline of this project. A free account opens every field.

Source: PV Tech

A 250MW solar PV project located in Franklin County, New York, awarded to Canadian independent power producer Boralex. Construction is expected to begin in 2026 with commissioning forecasted for 2028.

Status
Prospective
Sector
Power Generation (CCGT), Solar, Government
Location
Franklin County, New York, United States of America
Updated
22 Jul 2026
Source
PV Tech

ConstructChat

Ask ConstructChat about Fort Covington Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fort Covington Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Franklin County, New York, United States. Taiyo aggregates data on it from PV Tech.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 250MW solar PV project located in Franklin County, New York, awarded to Canadian independent power producer Boralex. Construction is expected to begin in 2026 with commissioning forecasted for 2028.

Original sector

Energy

Location

Country

United States of America (USA)

State

New York

City

Franklin County

Source

Source

PV Tech

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Government

Article published date

2025-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project