logo
ProjectClosed

Fort Mcmurray & St. Paul Courthouse - VC Expansion

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge

1 The scope of this project is to provide additional circuits of power to the courtrooms, provide pathways, install and label low voltage cables supplied by the province. These pathways shall be new and not disturb existing cabling. Once the cabling is in place the Provinces AV contractor shall install the new Video Conferencing Expansion. Once complete the Electrical Contractor will remove the ol

Status
Closed
Sector
Power Generation (CCGT), Commercial, Manufacturing (Industrial), Telecommunications, Government, Residential
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fort Mcmurray & St. Paul Courthouse - VC Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fort Mcmurray & St. Paul Courthouse - VC Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1 The scope of this project is to provide additional circuits of power to the courtrooms, provide pathways, install and label low voltage cables supplied by the province. These pathways shall be new and not disturb existing cabling. Once the cabling is in place the Provinces AV contractor shall install the new Video Conferencing Expansion. Once complete the Electrical Contractor will remove the old AV cabling systems. .2 Submit shop drawings, product data and samples as specified, indicating ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Manufacturing (Industrial), Telecommunications, Government, Residential

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project