Fort Plains Road Reconstruction & Resurfacing
Sector: Water Supply and Storage • Location: Howell Township, New Jersey, United States of America
Source: Dodge
The scope of work includes 8,020 SY of HMA milling with 1,010 Tons of HMA overlay, striping, minor drainage improvements, installation of concrete curb and driveway aprons, site restoration, and associated work as depicted on the contract documents.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Manufacturing (Industrial), Road, Commercial
- Location
- Howell Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fort Plains Road Reconstruction & Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes 8,020 SY of HMA milling with 1,010 Tons of HMA overlay, striping, minor drainage improvements, installation of concrete curb and driveway aprons, site restoration, and associated work as depicted on the contract documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Howell Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
