Fort Thomas Boilers Replace
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project includes all construction activities necessary to successfully complete project. the boiler and chiller plants at Fort Thomas. This construction project requires general contracting, electrical controls, mechanical, etc. to be successfully completed. As this is an occupied space, planning for phasing the construction work may be required. The period of performance is 913 days after No
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Fort Thomas, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fort Thomas Boilers Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes all construction activities necessary to successfully complete project. the boiler and chiller plants at Fort Thomas. This construction project requires general contracting, electrical controls, mechanical, etc. to be successfully completed. As this is an occupied space, planning for phasing the construction work may be required. The period of performance is 913 days after Notice to Proceed (NTP).This project will replace Work will include all labor, materials, equipment... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Fort Thomas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
