logo

Fostoria-Lima Transmission Line Rebuild

Sector: Power Generation (CCGT) • Location: Ohio, United States

Source: Industrial Info Resources

Project
Under Construction

Rebuild of a 138-kilovolt transmission line between Fostoria and Lima, Ohio, including upgrades to the East Lima substation. Certain segments have been completed, with the remainder expected to finish in the second half of 2027.

Status
Under Construction
Sector
Power Generation (CCGT), Manufacturing (Industrial)
Location
Ohio, United States of America
Updated
22 Jul 2026
Source
Industrial Info Resources

ConstructChat

Ask ConstructChat about Fostoria-Lima Transmission Line Rebuild

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fostoria-Lima Transmission Line Rebuild” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ohio, United States. Taiyo aggregates data on it from Industrial Info Resources.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rebuild of a 138-kilovolt transmission line between Fostoria and Lima, Ohio, including upgrades to the East Lima substation. Certain segments have been completed, with the remainder expected to finish in the second half of 2027.

Original sector

Power

Budget

Location

Country

United States of America (USA)

State

Ohio

Source

Source

Industrial Info Resources

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project