Foulem Subdivision: Replacement of Sanitary and Water Supply Systems
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Replacement of the aquaduct and sanitary network of the Foulem housing estate. The replacement of the rainwater pipes at Francine Street and Denis Street, and Luc Street and Foulem Street. The project includes related road works that are needed to complete the project.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Foulem Subdivision: Replacement of Sanitary and Water Supply Systems
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of the aquaduct and sanitary network of the Foulem housing estate. The replacement of the rainwater pipes at Francine Street and Denis Street, and Luc Street and Foulem Street. The project includes related road works that are needed to complete the project. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
