Foundation Shelter Replacement
Bid results · Michigan · Last reported Jul 2024
Source: Dodge USA
The Federal Aviation Administration (FAA) has a requirement for the replacement of runway 26L glide slope shelter foundation. The work described hereunder consists of furnishing all necessary materials, labor, equipment, tools and supervision to replace the existing Runway 26L glide slope shelter foundation at Gerald Ford International Airport, Grand Rapids, Michigan.
- Status
- Closed
- Sector
- Airport, Aerospace & Defense, Commercial, Manufacturing (Industrial)
- Location
- Grand Rapids, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Foundation Shelter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Federal Aviation Administration (FAA) has a requirement for the replacement of runway 26L glide slope shelter foundation. The work described hereunder consists of furnishing all necessary materials, labor, equipment, tools and supervision to replace the existing Runway 26L glide slope shelter foundation at Gerald Ford International Airport, Grand Rapids, Michigan. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grand Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Aerospace & Defense, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
