Founders & Boulevard Parks Site Work
Sector: Water Supply and Storage • Location: Lake Saint Louis, Missouri, United States of America
Source: Dodge USA
Scope of work : The project consists of a base bid for two separate parks with add alternate options. The base bid includes but is not limited to over 10,000 linear feet of asphalt trail removal and replacement, retaining walls, additional parking stalls, 12 culvert pipe, rain garden, water and electric service line installation, concrete stairways, and pedestrian lighting. Additional work may inc
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Car parking, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Manufacturing (Industrial), Automotive
- Location
- Lake Saint Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Founders & Boulevard Parks Site Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : The project consists of a base bid for two separate parks with add alternate options. The base bid includes but is not limited to over 10,000 linear feet of asphalt trail removal and replacement, retaining walls, additional parking stalls, 12 culvert pipe, rain garden, water and electric service line installation, concrete stairways, and pedestrian lighting. Additional work may include any, or all, of the following: Dugouts for baseball field, additional concrete pads, additio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lake Saint Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Car parking, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Manufacturing (Industrial), Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
