Founders Park Site Work Facility Maintenance
Sector: Water Supply and Storage • Location: Lake Saint Louis, Missouri, United States of America
Source: Dodge USA
The City of Lake Saint Louis is accepting sealed bids for site preparation related to a future park maintenance building. This project includes earthwork/excavation/grading, installation of underground electric, water, and sewer services, asphalt and concrete work, installation of utility light poles, concrete bin storage area, and fencing. Located at Founders Park (7 Freymuth Road) and Boulevard
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The City of Lake Saint Louis is accepting sealed bids for site preparation related to a future park maintenance building. This project includes earthwork/excavation/grading, installation of underground electric, water, and sewer services, asphalt and concrete work, installation of utility light poles, concrete bin storage area, and fencing. Located at Founders Park (7 Freymuth Road) and Boulevard Park (2550 Lake Saint Louis Boulevard). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
