Founders Park Site Work Facility Maintenance
Sector: Water Supply and Storage • Location: Lake Saint Louis, Missouri, United States of America
Source: Dodge USA
The City of Lake Saint Louis is accepting sealed bids for site preparation related to a future park maintenance building. This project includes earthwork/excavation/grading, installation of underground electric, water, and sewer services, asphalt and concrete work, installation of utility light poles, concrete bin storage area, and fencing. Located at Founders Park (7 Freymuth Road) and Boulevard
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Cement, Power Transmission, Car parking, Government, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Commercial
- Location
- Lake Saint Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Founders Park Site Work Facility Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Lake Saint Louis is accepting sealed bids for site preparation related to a future park maintenance building. This project includes earthwork/excavation/grading, installation of underground electric, water, and sewer services, asphalt and concrete work, installation of utility light poles, concrete bin storage area, and fencing. Located at Founders Park (7 Freymuth Road) and Boulevard Park (2550 Lake Saint Louis Boulevard). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lake Saint Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Power Transmission, Car parking, Government, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
