Four Intersection Protected Left Turn Signal Phasing Install
Sector: Cement • Location: Anaheim, California, United States of America
Source: Dodge
The work to be done consists of the upgrade of four (4) existing traffic signals for left-turn phasing operation improvements. This shall include installation of traffic signal poles; foundations; signal heads; signal controller and cabinet; conduit; pull boxes; conductors; accessible pedestrian signals; traffic signing; removal and reconstruction of ADA access ramps; concrete sidewalk and all add
- Status
- Closed
- Sector
- Cement, Government, Consumer Products, Manufacturing (Industrial), Car parking, Commercial, Road, Automotive
- Location
- Anaheim, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Four Intersection Protected Left Turn Signal Phasing Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done consists of the upgrade of four (4) existing traffic signals for left-turn phasing operation improvements. This shall include installation of traffic signal poles; foundations; signal heads; signal controller and cabinet; conduit; pull boxes; conductors; accessible pedestrian signals; traffic signing; removal and reconstruction of ADA access ramps; concrete sidewalk and all additional work necessary to properly construct the proposed improvements, in accordance with the co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Anaheim |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Consumer Products, Manufacturing (Industrial), Car parking, Commercial, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
