ProjectActive

Fourth Energy Sector Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

• Component 1: Transmission Line construction and Associated Substation Expansion (US$75.84 million IBRD). This component will finance the construction of a new 220kV double circuit transmission line from the Mandalgovi substation to the Arvaikheer substation. A new substation and 2.2 km 110kV transmission line will be constructed at Arvaikheer to connect the new 220kV facilities to the existing 1

Status
Prospective
Sector
Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
Mongolia
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Fourth Energy Sector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fourth Energy Sector Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mongolia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

• Component 1: Transmission Line construction and Associated Substation Expansion (US$75.84 million IBRD). This component will finance the construction of a new 220kV double circuit transmission line from the Mandalgovi substation to the Arvaikheer substation. A new substation and 2.2 km 110kV transmission line will be constructed at Arvaikheer to connect the new 220kV facilities to the existing 110kV system. The existing Mandalgovi substation will be expanded to connect the new 220kV transmission line. The new transmission line will provide an additional power supply source to the Arvaikheer region, which is currently served by a single corridor 110kV transmission line despite significant commercial and industrial demand. The transmission line will, therefore, serve the following purposes: (i) increase power supply capacity; (ii) enable VRE generation in the region; and (iii) improve system resilience and reliability. Climate proofing measures will be embedded in the transmission line and substations.• Component 2: Implementation Support (US$2.16 million IBRD and US$0.84 counterpart funding). This component will provide technical and operational assistance to strengthen the institutional and technical capacity of relevant agencies, including MOE and other entities affiliated to MOE. It will also provide implementation support, and project management, including financial management, disbursement, procurement, environmental and social risk and impact management, and monitoring, reporting and evaluation.

Location

Country

Mongolia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project