Fourth Inland Waterways Project
Sector: Road • Location: China
Source: World Bank
The main objective of Fourth Inland Waterways Project is to improve access for poor regions of southern China by upgrading navigation conditions on the region's major east-west river and other waterways feeding traffic into the Pearl River Delta region. A secondary objective is to harness water flow in two of these rivers to generate environmentally clean electricity to help meet growing energy d
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main objective of Fourth Inland Waterways Project is to improve access for poor regions of southern China by upgrading navigation conditions on the region's major east-west river and other waterways feeding traffic into the Pearl River Delta region. A secondary objective is to harness water flow in two of these rivers to generate environmentally clean electricity to help meet growing energy demand in the provinces of Guangdong Autonomous Region and Guangxi. There are two components, each with multi-subcomponents. The first component for Guangxi constructs a dam, power station, and shiplock; builds access roads; provides bank protection with reservoirs and a dam; installs turbines, lock gates, and other equipment; supports channel improvement; supports institutional strengthening, consultants services, and training; and provides finance for resettlement and land acquisition, as well as for site management. The second component for Guangdong Autonomous Region supports channel improvement; replacement of two bridges, construction of a dam, power station, shiplock, and access road; the installation of turbines, lock gates, and other equipment; upgrades navigational aids; the purchase of computer hardware for electronic mapping, shiplock management, and a management information system; the financing of service vessels, services vehicles, a survey, monitoring, and ancillary equipment; institutional strengthening, consultant services, and training; and land acquisition. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in China
- Beilungang CoalFired
- Sanofi Lantus SoloSTAR Pen Assembly Plant, Yizhuang, Beijing
- Eisai’s New Oral Solid Dose Production Facility, Suzhou
- National Highway No 314 Extension
- Xihoumen Bridge
- Changbei Tight Gas Project, Shaanxi
- Shuangyu District Rural Roads PPP Project
- Shanxi Province National and Provincial Road Surface Reconstruction Project (Jinzhong)
