Fourth Water Plant Site Preparation
Sector: Power Generation (CCGT) • Location: Powell, Ohio, United States of America
Source: Dodge USA
This project involves consists of general clearing, tree removal, preliminary grading, and stormwater management for Merchant Road Quarry (MRQ) Substation site; 505 LF of concrete encased electrical duct bank from MRQ Substation to electrical manholes; a new 138kV:12.47kV Substation including all structures, circuit breakers, disconnect switches, liquid-filled power transformers, switchgear, contr
- Status
- Prospective
- Sector
- Power Generation (CCGT), Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Powell, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fourth Water Plant Site Preparation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves consists of general clearing, tree removal, preliminary grading, and stormwater management for Merchant Road Quarry (MRQ) Substation site; 505 LF of concrete encased electrical duct bank from MRQ Substation to electrical manholes; a new 138kV:12.47kV Substation including all structures, circuit breakers, disconnect switches, liquid-filled power transformers, switchgear, controls, pre-fabricated electrical building, security wall and fence, and all appurtenances at the MR... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Powell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
