logo

Fourth Water Plant Site Preparation

Sector: Water Supply and Storage • Location: Powell, Ohio, United States of America

Source: Dodge

Project
Closed

This project involves consists of general clearing, tree removal, preliminary grading, and stormwater management for Merchant Road Quarry (MRQ) Substation site; 505 LF of concrete encased electrical duct bank from MRQ Substation to electrical manholes; a new 138kV:12.47kV Substation including all structures, circuit breakers, disconnect switches, liquid-filled power transformers, switchgear, contr

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road
Location
Powell, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fourth Water Plant Site Preparation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fourth Water Plant Site Preparation” is an infrastructure initiative in the Water Supply and Storage sector, located in Powell, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves consists of general clearing, tree removal, preliminary grading, and stormwater management for Merchant Road Quarry (MRQ) Substation site; 505 LF of concrete encased electrical duct bank from MRQ Substation to electrical manholes; a new 138kV:12.47kV Substation including all structures, circuit breakers, disconnect switches, liquid-filled power transformers, switchgear, controls, pre-fabricated electrical building, security wall and fence, and all appurtenances at the MR...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Powell

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project