Fox Meadows Wind Farm Project
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Canadian Broadcasting Corporation (CBC)
The Alberta Utilities Commission has begun its public hearing into the Fox Meadows wind farm project, which aims to produce 165 megawatts of energy through up to 25 turbines and a related substation and energy storage facility. The project is located in the Municipal Districts of Wainwright and Provost, approximately 17 kilometers south of Edgerton, Alberta.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Raw Materials, Government, Wind
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Canadian Broadcasting Corporation (CBC)
ConstructChat
Ask ConstructChat about Fox Meadows Wind Farm Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Alberta Utilities Commission has begun its public hearing into the Fox Meadows wind farm project, which aims to produce 165 megawatts of energy through up to 25 turbines and a related substation and energy storage facility. The project is located in the Municipal Districts of Wainwright and Provost, approximately 17 kilometers south of Edgerton, Alberta. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
Source
Source | Canadian Broadcasting Corporation (CBC) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Raw Materials, Government, Wind |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
