Foxconn Fallbrook Phase 2 Manufacturing Addition
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
THE SCOPE OF WORK INLCUDES 3 AIR CONDITIONED ROOMS THAT WILL HOUSE SERVER CONTAINMENT ROOMS AS WELL AS AN ELECTRICAL ROOM AS AN ACCESSORY TO THE SERVER ROOMS. MECHANICAL CHILLER AREA ON SITE WILL BE DESIGN BUILD AND IS NOT IN ARCHITECTURAL SCOPE. Square Footage: 22,541.
- Status
- Prospective
- Sector
- Cement, Manufacturing (Industrial), Commercial, Power Generation (CCGT)
- Location
- Houston, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Foxconn Fallbrook Phase 2 Manufacturing Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | THE SCOPE OF WORK INLCUDES 3 AIR CONDITIONED ROOMS THAT WILL HOUSE SERVER CONTAINMENT ROOMS AS WELL AS AN ELECTRICAL ROOM AS AN ACCESSORY TO THE SERVER ROOMS. MECHANICAL CHILLER AREA ON SITE WILL BE DESIGN BUILD AND IS NOT IN ARCHITECTURAL SCOPE. Square Footage: 22,541. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Commercial, Power Generation (CCGT) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
