Foxconn Megawatt Fallbrook Phase 2 - Data Center Addition
Sector: Commercial • Location: Houston, Texas, United States of America
Source: Dodge USA
THE SCOPE OF WORK INLCUDES 3 AIR CONDITIONED ROOMS THAT WILL HOUSE SERVER CONTAINMENT ROOMS AS WELL AS AN ELECTRICAL ROOM AS AN ACCESSORY TO THE SERVER ROOMS. MECHANICAL CHILLER AREA ON SITE WILL BE DESIGN BUILD AND IS NOT IN ARCHITECTURAL SCOPE. Square Footage: 22,541
- Status
- Closed
- Sector
- Commercial, Data Center, Power Generation (CCGT), Manufacturing (Industrial), Cement
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Foxconn Megawatt Fallbrook Phase 2 - Data Center Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THE SCOPE OF WORK INLCUDES 3 AIR CONDITIONED ROOMS THAT WILL HOUSE SERVER CONTAINMENT ROOMS AS WELL AS AN ELECTRICAL ROOM AS AN ACCESSORY TO THE SERVER ROOMS. MECHANICAL CHILLER AREA ON SITE WILL BE DESIGN BUILD AND IS NOT IN ARCHITECTURAL SCOPE. Square Footage: 22,541 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Power Generation (CCGT), Manufacturing (Industrial), Cement |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
