Foxx URE Barueri Waste to Energy Power Plant

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

In March 2013, the Brazilian company Foxx URE-BA Ltda, a subsidiary of Foxx Inova Ambiental S. A., was granted the 30-year authorization by the regulatory agency ANEEL to build and operate a urban waste residue fueled power plant located in the municipality of Barueri, state of Sao Paulo (20 MW in total capacity). In 2011, the company had signed a 30-year public-private partnership to build the

Project Information FAQ

Project Information

5 Q
The project “Foxx URE Barueri Waste to Energy Power Plant” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2013, the Brazilian company Foxx URE-BA Ltda, a subsidiary of Foxx Inova Ambiental S. A., was granted the 30-year authorization by the regulatory agency ANEEL to build and operate a urban waste residue fueled power plant located in the municipality of Barueri, state of Sao Paulo (20 MW in total capacity). In 2011, the company had signed a 30-year public-private partnership to build the waste to energy facility with the municipality of Barueri (the power plant was allowed to be built on the municipalities land and to use local solid waste). Foxx-Haztec focuses its activities in waste recovery, renewable energy, and disposal in landfills. The company currently manages 30,000 tons of waste daily, representing 15% of the national market. The total investment committed to project was estimated at US$ 111 million. In May 2015, the IFC granted a loan of US$ 30 million to the project. In addition, the state-owned bank Caixa Economica Federal also granted a US$ 69 million loan to the project. The remaining costs were equity financed. In September 2014, the sponsor signed a 15-year electricity offtake agreement with the distribution company CEMIG. The project company agreed to provide the interconnection of the WtE plant to the electricity grid through an existing transmission line of 88/138 kV and an existing energy substation adjacent to the site. Commercial operation was set to initiate in June 2018. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In August 2012, the sponsor applied for carbon credits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data