Foz do Chopim Small Hydro Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Foz do Chopim Energetica Ltda., a partnership of the state-owned electricity distribution company Copel (36%) and SILEA Participações Ltda (64%) was granted authorization to build a 29-MW small hydro power plant located in the Chopim River, state of Parana (municipality of Cruzeiro do Iguacu). The 30-year contract was signed with the regulatory agency ANEEL in April 2000.

Project Information FAQ

Project Information

4 Q
The project “Foz do Chopim Small Hydro Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Foz do Chopim Energetica Ltda., a partnership of the state-owned electricity distribution company Copel (36%) and SILEA Participações Ltda (64%) was granted authorization to build a 29-MW small hydro power plant located in the Chopim River, state of Parana (municipality of Cruzeiro do Iguacu). The 30-year contract was signed with the regulatory agency ANEEL in April 2000. Foz do Chopim Energetica committed to invest US$ 21.6 million (BRL 51.4 million) in the construction of the project. In 2001, the company tried to obtain a loan from the state-owned bank BNDES, but was not successful. Copel then decided to a US$ 12 million (BRL 28.5 million) loan to Foz do Chopim Energetica. This fact raised suspicion of wrong doing and the transaction became target of judicial investigation in 2003. This investigation process was later suspended, and Foz do Chopim Energetica started paying the debt once operations commenced. Construction works on this plant started in the end of 2000, and the unit became operational in the end of 2001. Copel signed a 10-year power purchase agreement with Foz do Chopim Energetica also in 2001.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data