logo

FPL Ped & Bike Improvements

Sector: Road • Location: Royal Palm Beach, Florida, United States of America

Source: Dodge USA

Project
Pre-Design

Replace the existing 8.0' wide asphalt pathway with a 10.0' wide concrete pathway from Bilbao St. to Okeechobee Blvd. Expand walkways on Okeechobee Blvd. and add a 10.0' wide concrete pathway adjacent to the Brass Ring parking lot. Replace the existing 4' sidewalk with 10' on the south side of Sparrow Dr. between Sweet Bay Ln and Crestwood Blvd. Add new sidewalk on Lamstein Ln. between Seminole La

Status
Prospective
Sector
Road, Cement, Car parking, Government, Automotive, Commercial
Location
Royal Palm Beach, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FPL Ped & Bike Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FPL Ped & Bike Improvements” is an infrastructure initiative in the Road sector, located in Royal Palm Beach, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the existing 8.0' wide asphalt pathway with a 10.0' wide concrete pathway from Bilbao St. to Okeechobee Blvd. Expand walkways on Okeechobee Blvd. and add a 10.0' wide concrete pathway adjacent to the Brass Ring parking lot. Replace the existing 4' sidewalk with 10' on the south side of Sparrow Dr. between Sweet Bay Ln and Crestwood Blvd. Add new sidewalk on Lamstein Ln. between Seminole Lakes Dr. and Cape Ivy Point. The Village of Royal Palm Beach of may be seeking a consultant to pro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Royal Palm Beach

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Cement, Car parking, Government, Automotive, Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project