logo

Frame House I / Jespersen Nodtvedt

Sector: Steel • Location: Denmark

Source: ArchDaily

Project
Closed

Text description provided by the architects.Frame House I is a single-family house situated in the old part of Copenhagen's southern harbor, originally inhabited by the dockworkers. The area is characterized by an ensemble of small-scale buildings; workshops and living units of self-built houses and architectural experiments. The infill-house is tucked in between two existing buildings with three

Project Information FAQ

Project Information

3 Q
The project “Frame House I / Jespersen Nodtvedt” is an infrastructure initiative in the Steel sector, located in Denmark. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.Frame House I is a single-family house situated in the old part of Copenhagen's southern harbor, originally inhabited by the dockworkers. The area is characterized by an ensemble of small-scale buildings; workshops and living units of self-built houses and architectural experiments. The infill-house is tucked in between two existing buildings with three wooden frames spanning in between the neighboring houses. With a critical approach towards sustainability trends, the house is the office's first project to explore the idea of a structural frame system independent of the climate screen, doing so with a reinterpretation of a traditional Danish half-timbered house.The facade is mounted on a structural, self-bearing frame, allowing for future changes or replacements of facades due to renovation, change in function, or a desire for different window openings. After being prepared in the workshop, the bearing timber structure was assembled at full height within 2 days without the use of metal nails or screws. The timber joints vary according to the need of compression and tension forces, including both mortise and tenon joints, as well as embedded steel fittings attached with steel dowels to create a column free floor plan on the ground floor. The large windows are placed on the outside of the timber structure, giving the impression of looking directly through the wooden structure and out into the open air.To the north, the façade is enclosed towards the small road with, while the building opens towards its counter position with large windows and entrance to a small garden. The visible wooden structure is exposed throughout the house, from the outside through diagonal trusses through some of the smaller windows, or as a new layer behind the window frames in the larger window opens. Inside, the three wooden frames and its structural logic is a part of the spatial expression, either painted white or in the red nuances of Douglas-fir.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data