logo

Frame Park Formal Gardens Pathway Irrigation & Drainage Sys

Sector: Water Supply and Storage • Location: Waukesha, Wisconsin, United States of America

Source: Dodge

Project
Bidding

200 Lin. Ft. of Temporary Fencing 150 Tons of Crushed Limestone Pathway and Base Course 125 Lin. Ft. of 8-Inch PVC Storm Sewer Pipe 270 Lin. Ft. of 6-Inch PVC Storm Sewer 900 Sq. Ft. of 4-Inch Concrete Sidewalk 850 Lin. Ft. of Brick Pathway Edging 350 Sq. Yds. of Grass Restoration 1 Lump Sum of Irrigation System Installation

Status
Prospective
Sector
Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Manufacturing (Industrial), Car parking, Commercial, Raw Materials, Automotive
Location
Waukesha, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Frame Park Formal Gardens Pathway Irrigation & Drainage Sys

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Frame Park Formal Gardens Pathway Irrigation & Drainage Sys” is an infrastructure initiative in the Water Supply and Storage sector, located in Waukesha, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

200 Lin. Ft. of Temporary Fencing 150 Tons of Crushed Limestone Pathway and Base Course 125 Lin. Ft. of 8-Inch PVC Storm Sewer Pipe 270 Lin. Ft. of 6-Inch PVC Storm Sewer 900 Sq. Ft. of 4-Inch Concrete Sidewalk 850 Lin. Ft. of Brick Pathway Edging 350 Sq. Yds. of Grass Restoration 1 Lump Sum of Irrigation System Installation

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Waukesha

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Manufacturing (Industrial), Car parking, Commercial, Raw Materials, Automotive

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project