logo
ProjectPlanned

Francis Scott Key Bridge Replacement Project

Planned · Maryland · Last reported Dec 2025

Source: The Maritime Executive

A replacement bridge for the Francis Scott Key Bridge is being built after the original bridge collapsed in 2024. Initial contracts have been awarded, but the projected cost has more than doubled. The new bridge is anticipated to be completed by late 2030.

Status
Prospective
Sector
Bridge, Seaport, Government
Location
Baltimore, Maryland, United States of America
Updated
22 Jul 2026
Source
The Maritime Executive

ConstructChat

Ask ConstructChat about Francis Scott Key Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Francis Scott Key Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Baltimore, Maryland, United States. Taiyo aggregates data on it from The Maritime Executive.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A replacement bridge for the Francis Scott Key Bridge is being built after the original bridge collapsed in 2024. Initial contracts have been awarded, but the projected cost has more than doubled. The new bridge is anticipated to be completed by late 2030.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Baltimore

Source

Source

The Maritime Executive

URL

More Details

Record type

Project

Sector

Bridge, Seaport, Government

Article published date

2026-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project