Francis Scott Key Bridge Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: Insurance Journal
Demolition crews are removing the remaining pieces of the collapsed Francis Scott Key Bridge in Baltimore. The original bridge collapsed in 2024 after a container ship lost power and veered off course, killing six people. The replacement bridge, a cable-stayed design, is planned to be taller and better protected against ship strikes. It is expected to open in 2028 and is being constructed nearby d
- Status
- Failure
- Sector
- Warehouse, Bridge, Cement, Seaport, Power Generation (CCGT), Government
- Location
- Baltimore, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Insurance Journal
ConstructChat
Ask ConstructChat about Francis Scott Key Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under demolition |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition crews are removing the remaining pieces of the collapsed Francis Scott Key Bridge in Baltimore. The original bridge collapsed in 2024 after a container ship lost power and veered off course, killing six people. The replacement bridge, a cable-stayed design, is planned to be taller and better protected against ship strikes. It is expected to open in 2028 and is being constructed nearby during the demolition of the old bridge. The demolition phase involves cutting the concrete deck into sections for recycling and is expected to take about nine months. Officials are reevaluating the project cost, initially estimated at $1.7 billion, due to supply chain issues and other factors, and the completion date may change. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Baltimore |
Source
Source | Insurance Journal |
URL |
More Details
Record type | Project |
Sector | Warehouse, Bridge, Cement, Seaport, Power Generation (CCGT), Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
