Francis Scott Key Bridge Replacement
Sector: Government • Location: Baltimore, Maryland, United States
Source: Interesting Engineering
Following the catastrophic collapse of the Francis Scott Key Bridge in March 2024, Maryland selected engineering firm Kiewit to design and construct a replacement. The new cable-stayed bridge will maintain four lanes, increase vertical clearance from 185 feet to 230 feet, extend the span between primary support piers from 1,209 feet to 1,600 feet, and have a total length of 2 miles. The bridge is
- Status
- Under Construction
- Sector
- Government, Bridge, Road
- Location
- Baltimore, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Interesting Engineering
ConstructChat
Ask ConstructChat about Francis Scott Key Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Following the catastrophic collapse of the Francis Scott Key Bridge in March 2024, Maryland selected engineering firm Kiewit to design and construct a replacement. The new cable-stayed bridge will maintain four lanes, increase vertical clearance from 185 feet to 230 feet, extend the span between primary support piers from 1,209 feet to 1,600 feet, and have a total length of 2 miles. The bridge is engineered for a minimum 100-year lifespan, incorporating modern materials and advanced pier protection technologies to accommodate larger cargo vessels. The project is federally funded with a $73 million initial contract awarded for design and site preparation, aiming for completion in 2028. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Baltimore |
Source
Source | Interesting Engineering |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Road |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
