Francis Scott Key Bridge Replacement
Sector: Government • Location: Baltimore, Maryland, United States
Source: Interesting Engineering
Following the catastrophic collapse of the Francis Scott Key Bridge in March 2024, Maryland selected engineering firm Kiewit to design and construct a replacement. The new cable-stayed bridge will maintain four lanes, increase vertical clearance from 185 feet to 230 feet, extend the span between primary support piers from 1,209 feet to 1,600 feet, and have a total length of 2 miles. The bridge is
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Following the catastrophic collapse of the Francis Scott Key Bridge in March 2024, Maryland selected engineering firm Kiewit to design and construct a replacement. The new cable-stayed bridge will maintain four lanes, increase vertical clearance from 185 feet to 230 feet, extend the span between primary support piers from 1,209 feet to 1,600 feet, and have a total length of 2 miles. The bridge is engineered for a minimum 100-year lifespan, incorporating modern materials and advanced pier protection technologies to accommodate larger cargo vessels. The project is federally funded with a $73 million initial contract awarded for design and site preparation, aiming for completion in 2028. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
