logo
ProjectPlanned

Francis Scott Key Bridge Replacement

Sector: Road • Location: Baltimore, Maryland, United States

Source: WTOP

The project involves rebuilding the Francis Scott Key Bridge in Baltimore, Maryland, which collapsed in March 2024. The new cable-stayed bridge will have two 12-foot lanes in each direction, stretch more than two miles across the Patapsco River, and feature a higher clearance and taller structural framework than the original. The redesigned bridge will rise 230 feet above the water with twin tower

Status
Prospective
Sector
Road, Water Supply and Storage, Bridge, Government
Location
Baltimore, Maryland, United States of America
Updated
22 Jul 2026
Source
WTOP

ConstructChat

Ask ConstructChat about Francis Scott Key Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Francis Scott Key Bridge Replacement” is an infrastructure initiative in the Road sector, located in Baltimore, Maryland, United States. Taiyo aggregates data on it from WTOP.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves rebuilding the Francis Scott Key Bridge in Baltimore, Maryland, which collapsed in March 2024. The new cable-stayed bridge will have two 12-foot lanes in each direction, stretch more than two miles across the Patapsco River, and feature a higher clearance and taller structural framework than the original. The redesigned bridge will rise 230 feet above the water with twin towers reaching more than 600 feet high. The project is expected to be completed in 2028 and cost $2 billion, with an expected lifespan of a century.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Baltimore

Source

Source

WTOP

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Bridge, Government

Article published date

2025-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project