logo

Franconia–Springfield Rail Bypass

Sector: Rail • Location: Franconia–Springfield, Virginia, United States

Source: Engineering News-Record | ENR

Project
Under Construction

The Franconia–Springfield rail bypass is a grade-separated project designed to improve reliability for both passenger and freight rail through one of Virginia's busiest corridors. The project includes realigning 1.4 miles of passenger track and constructing a 0.6-mile flyover bridge initially carrying a single track but engineered to support a future second mainline. The design uses concrete colum

Status
Under Construction
Sector
Rail, Bridge, Steel, Cement, Government, Metal
Location
Franconia–Springfield, Virginia, United States of America
Updated
22 Jul 2026
Source
Engineering News-Record | ENR

ConstructChat

Ask ConstructChat about Franconia–Springfield Rail Bypass

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Franconia–Springfield Rail Bypass” is an infrastructure initiative in the Rail sector, located in Franconia–Springfield, Virginia, United States. Taiyo aggregates data on it from Engineering News-Record | ENR.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Franconia–Springfield rail bypass is a grade-separated project designed to improve reliability for both passenger and freight rail through one of Virginia's busiest corridors. The project includes realigning 1.4 miles of passenger track and constructing a 0.6-mile flyover bridge initially carrying a single track but engineered to support a future second mainline. The design uses concrete column piers with transverse steel floor beams and cast-in-place composite decks over the CSX freight mainline, with approach spans designed with longitudinal steel plate girders and steel deck plating. The project involves approximately 400,000 cubic yards of earthwork, embankments, and retaining walls, with temporary shoofly tracks to maintain rail operations during construction. Environmental assessments found no significant community impacts, and the project is funded through federal, state, and local sources.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Franconia–Springfield

Source

Source

Engineering News-Record | ENR

URL

More Details

Record type

Project

Sector

Rail, Bridge, Steel, Cement, Government, Metal

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project