Frank E Van WRRF Generators Install & Site Improvement
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge
The work to be performed consists principally of the furnishing of all labor and materials for: Installing Owner-furnished Power Distribution Control System, Medium Voltage Metal-Clad Switchgear, Standby Power Generators in Electrical Building, installing fuel system, site improvements, and site grading and restoration.
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Rochester, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Frank E Van WRRF Generators Install & Site Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed consists principally of the furnishing of all labor and materials for: Installing Owner-furnished Power Distribution Control System, Medium Voltage Metal-Clad Switchgear, Standby Power Generators in Electrical Building, installing fuel system, site improvements, and site grading and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Rochester |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
