Frank Satterfield WPCP Expansion to 3.6 MGD
Sector: Water Supply and Storage • Location: Perry, Georgia, United States of America
Source: Dodge USA
The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Installation of a cover on the screenings conveyor , Installation of a lime pump , Installatio
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Commercial, Road, Government, Manufacturing (Industrial)
- Location
- Perry, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Frank Satterfield WPCP Expansion to 3.6 MGD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Installation of a cover on the screenings conveyor , Installation of a lime pump , Installation of a tank and skid system for chemical phosphorus removal, Installation of four additional disk... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Perry |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Chemical (Industrial), Commercial, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
