Frank Valley Road Rehabilitation Project
Sector: Road • Location: Muir Beach, California, United States
Source: Marin Independent Journal
A $26.2 million federally funded project to rehabilitate Frank Valley Road, the two-lane route connecting Muir Beach to Mill Valley and Muir Woods National Monument. The project includes improving drainage, replacing and realigning the bridge over Redwood Creek, stabilizing road embankments with slope failure, and improving striping and signs. Construction is scheduled for summer 2028.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A $26.2 million federally funded project to rehabilitate Frank Valley Road, the two-lane route connecting Muir Beach to Mill Valley and Muir Woods National Monument. The project includes improving drainage, replacing and realigning the bridge over Redwood Creek, stabilizing road embankments with slope failure, and improving striping and signs. Construction is scheduled for summer 2028. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
