Frankenstein Movie Set Construction
Sector: Seaport • Location: Toronto and North Bay, Ontario, Canada
Source: Gold Derby
Construction of elaborate sets for Guillermo del Toro's Frankenstein movie, including Victor's lab, creature's lair, the lab's multiple sets, the top of the tower, the ice room, and a large ship set. The ship was a major construction project, 130-140 feet long, holding 100 people, and mounted on a gimbal, taking about six months to build.
- Status
- Closed
- Sector
- Seaport
- Location
- Toronto and North Bay, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Gold Derby
ConstructChat
Ask ConstructChat about Frankenstein Movie Set Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of elaborate sets for Guillermo del Toro's Frankenstein movie, including Victor's lab, creature's lair, the lab's multiple sets, the top of the tower, the ice room, and a large ship set. The ship was a major construction project, 130-140 feet long, holding 100 people, and mounted on a gimbal, taking about six months to build. |
Original sector | Film Production Infrastructure |
Location
Country | Canada |
State | Ontario |
City | Toronto and North Bay |
Source
Source | Gold Derby |
URL |
More Details
Record type | Project |
Sector | Seaport |
Article published date | 2025-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
